FLHS students build skills, construct house

Photos by Mary Bailey A house built by Forest Lake High School students is ready to be sold and moved to the new owner’s lot. The school board approved advertising the house at its Feb. 6 meeting. Above, students raise the roof. Thirteen juniors and seniors in Carpentry II built the 1,350-square-foot, two-bedroom home, after Architecture II students worked on the floor plan. “I don’t think people realize how good a job these kids do,” said Industrial Technology teacher Kevin Rivard. (Photo submitted)

A house built by Forest Lake High School students is ready to be sold and moved to the new owner’s lot. The school board approved advertising the house at its Feb. 6 meeting. Above, students raise the roof. Thirteen juniors and seniors in Carpentry II built the 1,350-square-foot, two-bedroom home, after Architecture II students worked on the floor plan. “I don’t think people realize how good a job these kids do,” said Industrial Technology teacher Kevin Rivard.
(Photo submitted)

up arrow